Project Date: 2011
Architect/Designer: Cube3 Architects and GDS Signs
Project Description: 240,000 SqFt new construction. GDS worked with team members from Elliot Hospital and Cube 3 to
design a sign package that matched the interior decor comprised of wayfinding directionals, elevator directories, main directories, a large glass donor display along with Corian donor plaques.